신규사업
NEW BUSINESS
Sink Roll Sleeve
Continuous galvanizing line(CGL)
Sink Roll:
Work in high-temperature molten metal environments
(Zn at 480℃, Al at 680℃)
-
Subject to severe corrosion and erosion
-
Sink roll:
Re-use through repair processes such as welding and hard facing
-
Sleeve and Bush:
Replaced with new components
Advanced Material Development Strategy
- 1) Concept design for material development considering process characteristics
- 2) Development of material specialized in heat resistance and corrosion resistance
- 3) Alloy powder production using gas atomization
- 4) Application of Special Heat Treatment to overcome the limitations of sintered materials and achieve defect-free materials
- 5) Design of bi-metallic material considering the area of use
- 6) Production of bi-metallic material through canning and bonding process
Improved material properties, cost efficiency, and optimized utilization
Bi-metallic material
- Good Wear Resistance
- Good Erosion Resistance
›
- Improved coating quality due to vibration reduction
- Reduced maintenance time due to long life time
›
- Quality improvement
- High value added
- Increased facility utilization
- Increased productivity
Material characteristics
Produced Product
GI Coil
AL Coil
Shell
Cr-Co ALLOY
Cr-Mo ALLOY
Features
Excellent corrosion resistance & wear resistance
Excellent heat resistance & corrosion resistance
Reference & Performance
Customer
Coating Line
Old Material
Life Cycle
New Material
Life Cycle
Company A
GI Coil
AL Coil
Stellite Alloy
Co-Alloy
14days
6days
TP-GI
TP-AL
2~3 times
2~3 times
* Life cycle depends on operating conditions